WOOD CHIP CONVEYOR SYSTEM PROJECT

Projects - 07/10/2024

PROJECT NAME: WOOD CHIP CONVEYOR SYSTEM FOR LOADING ONTO VEHICLES

ACHIEVEMENTS:
  • The system enabled the client to achieve a designed capacity loading goods onto vehicle of 350 tons/hour.
  • Eliminated the need for loaders, reducing equipment operating costs at the storage yard by 40%, and increased safety during wood chip yard operations and exploitation.

PROJECT REQUIREMENTS:

  • Increase the capacity of loading wood chip onto vehicles from 100 tons/hour to 350 tons/hour, reduce existing operational costs (using loaders and bulldozers).
  • Provide a mechanism to load materials onto vehicles that is easy, effective, and safer.

TECHNICAL SOLUTIONS:

  • The conveyor system was designed with an integrated hopper.
  • The hopper system allowed the bulldozer to climb on without affecting the structure or rigidity of the conveyor, giving clients more control over the loading wood chip onto vehicles process.