PROJECT NAME: VEHICLE LOADING CONVEYOR SYSTEM V3
ACHIEVEMENTS
- Reduced handling labor costs by 45% compared to the previous method.
- Increased handling productivity by 200%.
- The system has the ability to raise and lower at the discharge end, reaching deep into a container up to 9000mm.
PROJECT REQUIREMENTS
- Optimize the process and reduce labor and forklift costs.
- Reduce manual labor and avoid health impacts related to occupational diseases, such as shoulder and spinal issues for workers.
- Increase productivity in handling goods.
OWTEK THIEN HOA TECHNICAL SOLUTIONS
- The system was designed meets requirement that eliminated the distance traveled by workers while loading goods.
- The system is raised and lowered by a hydraulic mechanism, operated via a button control, allowing adjustment at the discharge end to match the required goods layer height.
- Installed an automatic counting system to evaluate worker productivity.